General Contracting

    North lake Blvd – Kings Beach CA

    Kings Beach, CA

    Project Overview

    The Concrete Pad for Spa Installation project at the Mourelatos Resort in Kings Beach, Lake Tahoe, involved the creation of a durable and stable foundation for a large spa. With a budget of $12,500 and a timeline of 2 weeks, this project aimed to enhance the resort's amenities by providing a solid base for the new spa, ensuring safety, stability, and longevity. The service type focused on foundation work to accommodate the specific needs of the spa installation.

    Scope of Work

    Site Preparation:

    • Excavation: The designated area for the spa was cleared and excavated to the required depth, ensuring a level surface and proper drainage.
    • Grading: The ground was graded to provide a smooth and even surface, preparing it for the concrete pour.

    Formwork and Reinforcement:

    • Formwork Installation: Wooden forms were constructed and placed around the perimeter of the excavation site to shape the concrete pad.
    • Reinforcement: Steel rebar was installed within the formwork to reinforce the concrete, enhancing its strength and durability to support the weight of the large spa.

    Concrete Pouring and Finishing:

    • Concrete Mixing and Pouring: High-quality concrete was mixed and poured into the formwork, ensuring an even distribution and adequate thickness to support the spa.
    • Smoothing and Leveling: The concrete surface was smoothed and leveled using specialized tools to create a flat, even pad. Careful attention was given to ensure a flawless finish, suitable for the spa installation.

    Curing and Inspection:

    • Curing Process: The concrete was left to cure for the specified period, allowing it to reach the necessary strength and durability.
    • Final Inspection: A thorough inspection was conducted to ensure the concrete pad met all specifications and quality standards, ready to support the spa.

    Timeline and Budget

    The Concrete Pad for Spa Installation project was completed within the allocated budget of $12,500 and the strict timeline of 2 weeks. Through efficient project management and skilled workmanship, the project was delivered on time and within budget.

    Gallery

    North lake Blvd – Kings Beach CA gallery 1

    Project Details

    Building Type

    Commercial

    Location

    Kings Beach, CA

    Timeline

    3 Months

    Budget

    $12,500.00

    Year Completed

    2024

    Size

    1090 sq. ft.

    Service Type

    General Contracting

    Sub-Service

    Foundation

    Key Features

    • Site Preparation
    • Excavation & Grading
    • Formwork & Reinforcement
    • Concrete Pouring

    What Clients Say